West Pearl River Delta Transportation Center

12/09/2023by TL
West Pearl River Delta Transportation Center (1)
West Pearl River Delta Transportation Center (2)
West Pearl River Delta Transportation Center (3)
West Pearl River Delta Transportation Center (4)
West Pearl River Delta Transportation Center (5)
West Pearl River Delta Transportation Center (6)
West Pearl River Delta Transportation Center (7)

West Pearl River Delta Transportation Center has a total investment of approximately RMB 4 billion and takes three years to complete. It has a total construction area of 254,500 square meters, including 54,500 square meters of station buildings. It has the characteristics of “station-city integration, three-dimensional transportation, novel design, and distinctive features”. It has 8 platforms and 20 lines, bringing together the existing Jiangzhan Railway, Guangzhou-Zhuhai Intercity Railway, Guangzhou-Zhuhai Railway, as well as the Shenjiang Railway under construction, the Zhuzhou-Zhaozhou Railway to be started, the planned Shenzhen-South High-speed Railway, and the Guangfo-Jiangsu-Zhuhai Intercity Railway. etc., with a maximum designed daily passenger volume of 71,500.

It covers an area of about 40,000 square meters and is about 250 meters deep. The main structure of Jiangmen Station has a large overall span, a high single-story height, and complex steel beam-column joints. Among them, the maximum length of a single span is 22 meters, the maximum erection height of a single-layer formwork is 10 meters, and there are up to 5 ways to install steel bars at a single beam-column node.

The “Tree of Life” is the hall of the transportation center. It has unique shapes, complex nodes, and large spans. Its overall weight reaches 1,500 tons.